Outdoor Stockpile Measurement

Fast, Accurate Drone Surveys for Open Stockyards

Cover your entire stockyard in hours, not days. Our DGCA-compliant drone surveys using RGB photogrammetry and LiDAR technology deliver 99% volume accuracy - transforming how you manage inventory.

100+ ha Coverage Per Day
99 % Volume Accuracy
90 % Faster Than Manual
24 hrs Report Delivery

Why Drone Surveys?

Traditional methods vs modern drone-based measurement

Traditional Methods

  • Manual tape/wheel measurements take days
  • Total station surveys are slow and expensive
  • 10-20% estimation errors common
  • Safety risks walking on unstable piles
  • Limited to accessible pile surfaces only

Drone Survey Advantage

  • Survey entire stockyard in 2-4 hours
  • Millions of measurement points captured
  • 99% accuracy with RTK positioning
  • No personnel on stockpiles - completely safe
  • Complete 3D surface capture from above

Two Technologies

We select the right approach based on your site conditions and requirements

RGB Photogrammetry

  • High-resolution camera captures overlapping images
  • Software reconstructs 3D surface from photos
  • Best for open, well-lit stockyards
  • Cost-effective for most applications
  • 1-3cm horizontal, 2-5cm vertical accuracy

LiDAR Drone Survey

  • Laser pulses measure distances directly
  • Works in any lighting condition
  • Penetrates vegetation and shadows
  • Best for complex terrain and mixed materials
  • 3-5cm vertical accuracy, no GCPs needed

Survey-Grade Equipment

We use enterprise-grade drones with RTK/PPK positioning for centimeter-level accuracy on every survey.

RTK/PPK Positioning

Real-Time Kinematic GPS delivers centimeter-level positioning accuracy on every image capture

High-Resolution Cameras

45+ megapixel sensors capture fine surface details for accurate 3D reconstruction

LiDAR Sensors

300,000+ pulses per second for dense point clouds in challenging conditions

DGCA Compliant

All operations follow DGCA regulations with certified remote pilots and equipment

Systematic Drone Flight Pattern

Outdoor Stockpile Applications

From mining pits to port terminals - accurate measurement for any open stockyard

Mining Stockyards

Coal, iron ore, bauxite, and mineral stockpiles at mine sites - ROM pads, crushing plants, and dispatch yards

Most Common

Cement Plant Yards

Limestone, clay, gypsum, and fuel stockpiles - pre-homogenization yards and raw material storage

Port Terminals

Bulk cargo stockpiles at ports - import/export yards, berth-side storage, and transit stockyards

Quarries & Crushers

Aggregate, sand, gravel, and crushed stone stockpiles at quarry sites and crushing plants

More Outdoor Applications

Industries We Serve

Trusted by leading companies across India's major industrial sectors

Coal Mining

ROM coal, washed coal, and rejects stockpiles at opencast mines, washeries, and loading points.

  • Pit-head stockyards
  • Washery input/output piles
  • Railway siding yards
Learn More

Iron Ore Mining

Iron ore fines, lumps, and pellet feed stockpiles at mines, beneficiation plants, and export yards.

  • ROM and processed ore
  • Grade-wise segregation
  • Export terminal yards
Learn More

Cement Industry

Limestone, clay, laterite, gypsum, and fuel stockpiles across integrated cement plants.

  • Captive mine stockyards
  • Plant raw material yards
  • Fuel (coal/petcoke) storage
Learn More

Steel Plants

Iron ore, coal, coke, flux, and slag stockpiles at integrated steel plants and sponge iron units.

  • Raw material yards
  • Coke oven coal storage
  • Slag and by-product piles
Learn More

How It Works

Simple 3-step process from request to report

1

Request Survey

Share your site details and requirements. We'll provide a quote within 24 hours and schedule the survey.

2

Drone Survey

Our DGCA-certified team conducts the aerial survey. Most stockyards are completed in 2-4 hours.

3

Volume Report

Receive detailed report with volumes, 3D model, orthomosaic, and comparison data within 24 hours.

What You Get

Comprehensive deliverables that go far beyond just volume numbers - everything you need for inventory management and audit compliance.

  • Accurate volume in cubic meters and tonnes
  • High-resolution orthomosaic map
  • 3D surface model and point cloud
  • Contour maps and cross-sections
  • Cut/fill analysis vs previous surveys
  • Cloud portal access for all data
Explore Cloud Portal
Iron ore mining stockyard with multiple stockpiles being measured by drone survey
12,450 m³ Pile A
8,320 m³ Pile B
15,780 m³ Pile C
6,190 m³ Pile D
9,870 m³ Pile E
Total Volume 52,610 m³

Engagement Models

Flexible options from one-time audits to continuous monitoring

One-Time Survey

Audit / Verification

Single comprehensive survey for year-end audit, handover verification, or dispute resolution

  • Complete stockyard coverage
  • Detailed volume report
  • 3D model & orthomosaic
  • Audit-ready documentation

Site Deployment

Enterprise

Dedicated team stationed at your site for daily or weekly measurements

  • On-site team & equipment
  • Daily/weekly measurements
  • Real-time inventory updates
  • Integration with your ERP
  • Custom reporting schedules

Not an Open Stockyard?

We have solutions for every environment

Ready to Measure Your Stockpiles?

Get accurate volumes for your outdoor stockyards. Free quote within 24 hours.